Our 1-Day Flooring Process
Every garage floor is different and requires various methods and products for application. That is why we customize our work and products to fit each and every project. We offer several different colors to fit the design and functionality you need for your garage, and are committed to providing a beautiful product when we are finished.Your garage should not only be stylish, but should also be functional. Depending on your needs, we can provide floors that are damage resistant, slip resistant, and durable against spills and drops.
Your garage is put through a lot over the years and keeping is protected can help reduce the maintenance and repairs needed in the future.
All of our services and products are affordable and provide effective solutions to make your garage floors safer, more functional, and much more beautiful.
We follow a very specific process to ensure every garage floor meets our customers needs and is up to perfect standards.
Concrete Coating in One Day!
- 7 am
PREPARATION & GRINDING - 9 am
CONCRETE RESTORATION - 10 am
BASE COAT & CHIP APPLICATION - 12 pm
SETUP TIME - 1 pm
SCRAPING - 2 pm
TOP COAT
Preparation & Grinding
To prepare for a perfect floor coating, we begin by clearing the area and the process of cleaning the surface from all dust and debris. We often shot-blast or use diamond grinding, with a vacuum attached to the grinder. This step also helps the coating last longer and look better in the end.
Concrete Restoration
When garage floor coatings are applied to damaged floors full of cracks and pits, the final product is damaged as well. Which is why we include floor restoration in our coating process. Restoring your garage floor such as adding fillers to the various cracks and pits can help the finished product look beautiful and smooth.
Base Coat & Chip
Once the floor is prepped, we mix and apply our pure Polyurea base coat. Next we broadcast the chip and flakes by hand which applies texture, color, slip resistance, and durability to the floor.
We have a variety of colors and floor designs to choose from to ensure you are completely satisfied with the look and functionality of your new floor.
Setup Time
The set up time often depends on the size and type of floor coating, but are usually within 1-2 hours, following the base application.
Scraping Floor
Once the floor coating is completely set up and dry, we will vacuum and scrape the surface to remove any loose flakes and smooth out the coating.
Polyaspartic Clear Coat Top Coat
We finish off every project with a polyaspartic clear coat, we use this in the process to ensure the floor lasts forever and is thoroughly protected from UV damage and wear and tear.